Volume 41 Issue 2
Mar.  2021
Turn off MathJax
Article Contents
CUI Tianshu, AN Junshe, WU Qi. Design of Ground Test System for Chang'E-4 Lander Load Electric Control Box[J]. Chinese Journal of Space Science, 2021, 41(2): 342-347. doi: 10.11728/cjss2021.02.342
Citation: CUI Tianshu, AN Junshe, WU Qi. Design of Ground Test System for Chang'E-4 Lander Load Electric Control Box[J]. Chinese Journal of Space Science, 2021, 41(2): 342-347. doi: 10.11728/cjss2021.02.342

Design of Ground Test System for Chang'E-4 Lander Load Electric Control Box

doi: 10.11728/cjss2021.02.342
  • Received Date: 2019-11-14
  • Rev Recd Date: 2020-06-07
  • Publish Date: 2021-03-15
  • The ground comprehensive test of spacecraft electronic equipment is an important part in the development of spacecraft. It plays an important role in equipment function verification and performance evaluation. The ground test system of the Chang'E-4 lander load electric control box adopts modular, reusable design and CPU+FPGA single-machine integrated architecture. It can provide power supply test, 1553B communication bus simulation test, indirect command test, asynchronous serial communication test, real-time data processing and other functions in one integrated system, is suitable for spacecraft electronic equipment single machine debugging, configuration test and environmental simulation test and other types of test requirements. The test of each interface, function and performance of the load electric control box indicates that the system meets the test requirements of stand-alone debugging, status confirmation and troubleshooting of the spaceborne equipment, which strongly supports the successful on-orbit operation of the Chang'E-4 lander load electric control box.

     

  • loading
  • [1]
    FENG Hua, LIU Shiyao. Chang'E-4 Successfully Landed on the Back of the Moon. The World's First Close-up Image of the Back of the Moon was Returned[OL].[2019-01-03]. http://news.china.com.cn/2019-01/03/content_74337087.html
    [2]
    CUI Xia, WU Jie, WANG Shiyu, et al. The Yutu 2 Patrol was Walking on the Moon, and Part of the Chang'E-4 Payload was Turned on[OL].[2019-01-04]. http://www.chinanews.com/gn/2019/01-04/8720470.html
    [3]
    CHEN Fang, HU Zhe, JIN Liwang. Good news! The Mission of Chang'E-4 was a Complete Success[OL].[2019-01-11]. http://www.xinhuanet.com/politics/2019-01/11/c_1123978466.html
    [4]
    DU Xue, ZHANG Jun. Design and implementation on integrated testing system for Beidou Navigation Satellite[J]. Comput. Meas. Control, 2015, 23(11):3616-3618, 3622 (杜雪, 张军. 北斗导航卫星 地面综合测试系统设计与实现[J]. 计算机测量与控制, 2015, 23(11):3616-3618, 3622)
    [5]
    BAO Weimin. Present situation and development tendency of aerospace control techniques[J]. Acta Automat. Sin., 2013, 39(6):697-702 (包为民. 航天飞行器控制技术研究现状与发展趋势[J]. 自动化学报, 2013, 39(6):697-702)
    [6]
    ZHANG Jinxing, AN Junshe. Study and implementation of automatic ground testing software system based on LabVIEW[J]. J. Comput. Appl., 2016, 36(S2):256-258 (张进兴, 安军社. 基于LabVIEW的自动化 地面测试软件系统[J]. 计算机应用, 2016, 36(S2):256-258)
    [7]
    LI Shan, AN Junshe. Design of ground test system based on PCI bus[J]. Missil. Space Vehicle, 2014, 2:65-70 (李姗, 安军 社. 基于PCI总线的航天设备地面测试系统设计[J]. 导弹与航天运载技术, 2014, 2:65-70)
    [8]
    YU Qiang, WANG Xiaoqing, GENG Baoming, et al. Universal testing system for space science experimental facilities[J]. Chin. J. Space Sci., 2016, 36(4):577-583 (于强, 王小庆, 耿宝明, 等. 空 间科学实验通用地面检测系统研制[J]. 空间科学学报, 2016, 36(4):577-583)
    [9]
    GAO Xiang, YAO Xiujuan, YAN Yi, et al. Design of general ground integrated test intermediate frequency receiver for satellite transmission system[J]. Chin. J. Space Sci., 2018, 38(1):109-117 (高翔, 姚秀娟, 闫毅, 等. 卫星数传分系统通用地检测试 中频接收机设计[J]. 空间科学学报, 2018, 38(1):109-117)
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article Views(427) PDF Downloads(56) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return